Property and substrate
Confirm the civic address and material unloading access. Confirm framing movement, substrate condition, drain position, shower slope and whether demolition is needed to inspect concealed water damage.

Front of Yonge · Leeds and Grenville tile services
Waterproof shower assemblies, bathroom floors, niches, curbs and feature walls. We handle your project from the assessment and materials to installation and finishing.
Request a quote
Plan the complete assembly
A successful tiled shower is built behind the tile first. The scope should treat drainage, waterproofing, penetrations, niches and edge profiles as one assembly, then set the visible tile to balanced lines. Bathroom floors should be prepared for the selected tile format and matched carefully to doorways, tubs and vanities.
Front of Yonge is listed in Ontario’s municipal directory in the Leeds and Grenville geographic area. We assess projects throughout the municipality, including addresses outside the main settlement. Tell us the property address, the room and whether the space will remain occupied during the work. We will assess the existing surface, material access and preparation before confirming the scope.
We carry out your tile work to the agreed scope. We confirm materials, preparation, pricing and scheduling with you before installation begins.
YOUR LOCAL PROJECT
We’ll follow up about your bathroom & shower tile request. Add your village or community name if it differs from the municipality shown.
ALL Front of Yonge SERVICES →A project-specific local brief
The waterproofing, drain, penetrations and tile finish need to be scoped as one assembly rather than separate cosmetic tasks. The notes below combine that service requirement with the property and access conditions commonly raised in Front of Yonge; the actual site still controls the final method.
Confirm the civic address and material unloading access. Confirm framing movement, substrate condition, drain position, shower slope and whether demolition is needed to inspect concealed water damage.
Check the existing surface and finished floor heights. Record the route for debris, backer panels and tile, plus water shutoff, elevator or work-hour rules when the bathroom is in an occupied building.
Agree on preparation, product requirements and available work dates. Keep waterproofing, mortar and grout within their required storage and curing temperatures; winter deliveries should not leave setting materials exposed to freezing.
Failure prevention
These are not a diagnosis of a particular property. They are prompts for the Front of Yonge site review and written scope.
Quote checklist
Start with the property address in Front of Yonge, the building type and the details below. Site verification may still be required.
Front of Yonge and surrounding areas
We serve Front of Yonge and nearby communities. Confirm your property location with us so we can plan access, travel and scheduling.
Common questions
Use the answers as a starting point and confirm the complete installation method for the actual property and product.
Start with bathroom and shower dimensions, photos of the room and visible damage, drain, tub, vanity and fixture locations. In Front of Yonge, the conversation should also cover confirm the civic address and material unloading access and check the existing surface and finished floor heights. For this project type, confirm shower waterproofing systems, custom niches and benches, bathroom floor tile.
Yes. We provide bathroom & shower tile in Front of Yonge. You work directly with Tiling.ca for your project. Availability is confirmed for the specific scope and schedule.
Timing depends on demolition, substrate condition, waterproofing and tile format. A straightforward installation is often completed in several working days, while custom niches, large-format tile or repair work can extend the schedule. Your written scope should identify the stages before work starts.
Sometimes, but only when the existing installation is sound, flat, well bonded and compatible with the new finished height. The existing surface should be inspected first. Removing failed or uncertain material is usually the safer choice for wet areas.
More guides for Front of Yonge